NEWS / BLOG
LATEST ARTICLES
BL Duke Awarded ESGR Above & Beyond Award
In honor of Veteran’s Day, we wanted to shine light on a program dedicated to warriors in the workforce. The Employee Support of the Guard and Reserve is a program that supports and bu [...]
Back to Business: BL Duke River Terminal Prepares for Illinois Waterway Reopening
BL Duke River Terminal, a division of BL Duke, is planning to resume normally scheduled business as repairs to the Illinois Waterway near completion. Northbound traffic from Port of NO [...]
Shannon E. Collins Foundation – 2020-2021 Scholarships Awarded!
Last year, our colleague and friend, Shannon Collins lost her battle to Metastatic Breast Cancer. Her courage, strength, and resiliency during her 5 year journey was an inspiration to [...]
Scrap Happens
Entering 2020, what everyone thought was a light at the end of the tunnel, was really an on coming train. “We were prepared for the Illinois River closure, but no one could have predicted the impact of COVID-19 on the metals industry ...”
IL River Closure Update
The US Army Corps of Engineers (USACE) has recently updated the schedule for the 2020 Illinois River closure, stating that five of eight locks will be closed starting in July 2020.
An Update on the 2020 Illinois River Closure
The US Army Corps of Engineers (USACE) has recently updated the schedule for the 2020 Illinois River closure, stating that five of eight locks will be closed starting in July 2020. We want to do our best to help you prepare.